Requests for Qualifications (RFQs)
|
|
|
Page last updated: May 14, 2012, 5:00 p.m.
Requests for Qualifications (RFQs) are published on an individual, ongoing basis, with varying deadlines for submissions. Agencies and institutions of higher education will request SAO to publish their RFQs as-needed using their own project-specific deadline for responses.
RFQs are listed in the order of when responses are due.
Those wishing to subscribe to receive e-mail notifications of when an RFQ is posted to the site may do so by clicking here. Please note: Subscribing is voluntary and you may unsubscribe at any time. In addition, this notification is sent out as a "bulk e-mail" which may be interrupted by your company's spam blocker. If you signed up for notifications but are not receiving them, please contact your company's IT department for more information.
EDGE Participation: For all Statements of Qualifications, please identify the EDGE-certified Business Enterprises, by name, which will participate in the delivery of the proposed professional services solicited in the RFQ.
Current RFQs:
| Published Date |
Due Date |
Project No. |
Agency/
Institution |
Project Name |
Primary Service |
Project
Cost (Est.)
|
Q&A / Misc.
|
| 05/09/2012 |
06/13/2012 |
Project
Number
TBD |
Owens Community College |
FY2013 Basic Renovations Projects
|
Architectural/Engineering |
$4,000,000-$12,000,000
|
N/A
|
| 04/26/2012 |
06/01/2012 |
OSU-120210 |
The Ohio State University |
OARDC Ag Engineering Building Replacement
|
Construction Management |
$14,000,000
|
N/A
|
| 05/14/2012 |
05/22/2012 |
OSU-110106 |
The Ohio State University |
Indoor Golf Facility (Criteria A/E)
|
Criteria Architect/Engineer |
$6,079,259
|
N/A
|
| 04/18/2012 |
05/21/2012 |
DNR-120034 |
Department of Natural Resources |
Shooting Range Improvements
|
Civil Engineering |
TBD
|
N/A
|
| 04/26/2012 |
05/18/2012 |
DRC-110022 |
Department of Rehabilitation and Correction |
Roof Replacement - Toledo Correctional Institution
|
Design-Builder |
$4,250,000
|
Question & Answer Document
|
| 04/16/2012 |
05/17/2012 |
UCN-04132B |
University of Cincinnati |
MSB Rehabilitation
Phase 4
|
Construction Management |
$45,000,000
|
N/A
|
Short List Report
SAO Consultant List Reports
|
|
|
|
|
Below are RFQs past the response deadline date. These documents are for reference only. At the end of each month, all RFQs published that month are compiled into an "Ohio Register" document using the next issue number. The archived Ohio Register issues are accessible by clicking here.
| Published Date |
Due Date |
Project No. |
Agency/
Institution |
Project Name |
Primary Service |
Project Cost (Est.)
|
Q&A
|
| 04/20/2012 |
05/11/2012 |
MUN-100020 |
Miami University |
Anderson & McFarland Hall Renovation
|
Architectural |
$20,000,000
|
N/A
|
| 04/06/2012 |
05/08/2012 |
SOC-120001 |
Southern State Community College |
Brown County Campus
|
Construction Management |
$10,000,000
|
Question & Answer Document
|
| 04/13/2012 |
04/27/2012 |
BGU-125778 |
Bowling Green State University |
BGSU Firelands Campus New Allied Health Sciences Building
|
Architecture including lab consultant |
$15,750,000
|
N/A
|
| 04/02/2012 |
04/24/2012 |
OHU-03242012 |
Ohio University |
Classroom & Office Building Renovations
|
Architecture |
$10,000,000
|
N/A
|
| 03/20/2012 |
04/23/2012 |
DMR-120003
(note: includes 51-page study) |
Ohio Department of Developmental Disabilities |
MVDC Kitchen Relocation
|
Architectural |
$1,269,263
|
N/A
|
| 04/04/2012 |
04/18/2012 |
CLT-100020 |
Clark State Community College |
Student Success Center
|
Architecture |
$5,400,000
|
Question & Answer Document
|
| 03/29/2012 |
04/18/2012 |
DRC-120006 |
Ohio Department of Rehabilitation and Correction |
Sallyport Upgrade- LrCl
|
Architectural |
$730,250
|
N/A
|
| 03/26/2012 |
04/16/2012 |
DRC-100037 |
Ohio Department of Rehabilitation and Correction |
Housing Unit Window Replacement - GCI
|
Architectural |
$832,216
|
N/A
|
| 03/29/2012 |
04/13/2012 |
KSU-12S605 |
Kent State University |
Science & Nursing Building
|
Architectural |
$2,765,722
|
N/A
|
| 03/20/2012 |
04/13/2012 |
KSU-11B146, KSU-11B147 & KSU-11B148 |
Kent State University |
Renovations and Addition to Multiple Science Buildings - Commissioning Agent
|
Commissioning Agent |
$80,000,000
|
Pre-Submission
Attendees
|
| 03/09/2012 |
04/12/2012 |
OSU-090442 |
The Ohio State University |
Smith Lab Rehabilitation (CM at Risk)
|
Construction Management |
$12,000,000
|
N/A
|
| 03/14/2012 |
04/10/2012 |
OHU-03092012 |
Ohio University |
Galbreath Chapel Renovations
|
Architecture |
$1,000,000
|
N/A
|
| 03/21/2012 |
04/09/2012 |
CSU-120016 |
Central State University |
Center for Human Performance and Sensor
|
Architectural and Engineering |
$500,000
|
N/A
|
| 03/26/2012 |
04/09/2012 |
DRC-120009 |
Ohio Department of Rehabilitation and Correction |
HCF Control Center Upgrade
|
Architectural |
$447,500
|
N/A
|
| 03/21/2012 |
04/09/2012 |
CSU-120017 |
Central State University |
Rehabilitation of Stadium Turf and Lights
|
NCAA Division II College Stadium Architecture and Design |
$2,000,000
|
N/A
|
| 03/14/2012 |
04/06/2012
03/30/2012 |
CLS-121205 |
Cleveland State University |
Viking Hall & Kinkos Demolition
|
Certified Professional |
$3,984,521
|
N/A
|
| 03/20/2012 |
04/04/2012 |
DRC-110026 |
Ohio Department of Rehabilitation and Correction |
Renovate Clearview School - ORW
|
Architectural |
$845,350
|
N/A
|
| 11/29/2011 |
03/29/2012 |
OSU-110670 |
Ohio Department of Administrative Services - SAO Office of Energy Services |
Energy Conservation Measures - The Ohio State University (RFP)
|
Energy Performance Contracting |
TBD
|
N/A
|
| 03/09/2012 |
03/28/2012
03/22/2012 |
BGU-125762 |
Bowling Green State University |
Executive CM Services
|
Construction Management |
$187,000,000
|
Addendum
Question & Answer Document
|
| 03/02/2012 |
03/21/2012
03/14/2012 |
DAS-12P009 |
Ohio Department of Administrative Services |
Assessment for Prop. & Facilities Buildings, Various Locations
|
Architectural |
$540,000
|
Question & Answer Document
|
| 03/02/2012 |
03/21/2012 |
DRC-120005 |
Department of Rehabilitation & Correction |
Roof Renovation - CMC
|
Architectural |
$1,404,355
|
N/A
|
03/26/2012 |
04/12/2012 |
MUN-100019 |
Miami University |
(Project Cancelled)
Equestrian Center - Phase 1
|
Civil Engineering |
$2,000,000
|
N/A
|
| 02/29/2012 |
03/16/2012 |
BGU-125753 |
Bowling Green State University |
Executive Architect/Engineering Services
|
Executive Architect/Engineering |
$187,000,000
|
Question & Answer Document
|
| 03/02/2012 |
03/16/2012
03/10/2012 |
UCN-10000B |
The University of Cincinnati |
Rieveschl Hall Phase 5 and 6
|
Architecture |
$15,000,000
|
N/A
|
| 02/09/2012 |
03/14/2012 |
OSU-080363 |
The Ohio State University |
Schottenstein Center - Basketball Practice Facility Project (CM at Risk)
|
Construction Management |
$13,771,907
|
N/A
|
| 02/21/2012 |
03/06/2012
03/02/2012
|
BGU-125750 |
Bowling Green State University |
Program Management Services
|
Program and Development Management |
$187,000,000
|
Question & Answer Document
|
| 02/09/2012 |
03/05/2012 |
OSU-081049 |
The Ohio State University |
Selected Tunnel Replacement Projects (CM at Risk)
|
Construction Management |
$6,380,000
|
N/A
|
| 02/09/2012 |
02/29/2012 |
OSU-091575 |
The Ohio State University |
Hospital Kitchens Renovation - Bid Package 2 (CM at Risk)
|
Construction Management |
$11,000,000
|
N/A
|
| 02/07/2012 |
02/28/2012 |
OHU-121730 |
Ohio University |
Computer Services Center HVAC Improvements
|
Mechanical, Electrical, Plumbing |
$1,600,000
|
N/A
|
| 02/21/2012 |
02/24/2012 |
UTO-121723 |
The University of Toledo |
Family Health Services Center (Renovation of VAB)
|
Architectural |
$6,000,000
|
N/A
|
| 02/08/2012 |
02/24/2012 |
WSU-120006 |
Wright State University |
Enrollment Services Renovation
|
Architecture |
$2,150,000
|
N/A
|
| 01/24/2012 |
02/24/2012 |
OSU-120136 |
The Ohio State University |
Wilce Addition and Renovation
|
Architecture |
$3,700,000
|
N/A
|
| 01/24/2012 |
02/23/2012 |
OSU-120192 |
The Ohio State University |
ULAR Animal Facility Building Study
|
Architectural |
$107,000
|
N/A
|
| 01/24/2012 |
02/17/2012 |
KSU-11B146, KSU-11B147 & KSU-11B148 |
Kent State University |
Renovations and Addition to Multiple Science Buildings - Architectural Team
|
Architectureal |
$80,000,000
|
N/A
|
| 01/24/2012 |
02/17/2012 |
KSU-11B146, KSU-11B147 & KSU-11B148 |
Kent State University |
Renovations and Addition to Multiple Science Buildings - MEP Team
|
MEP Engineer |
$80,000,000
|
N/A
|
| 02/01/2012 |
02/16/2012 |
OSU Prequal |
The Ohio State University |
General Qualifications for Prequalification List - F330 Form, Part 1
|
Varies |
Varies
|
N/A
|
| 01/24/2012 |
02/08/2012 |
OHU-121720 |
Ohio University |
Heritage College of Osteopathic Medicine, Columbus Area Medical Facility
|
Architectural |
TBD
|
Question & Answer Document
|
| 01/13/2012 |
02/03/2012 |
SOC-120001 |
Southern State Community College |
Brown County Campus
|
Architecture |
$10,000,000
|
Question & Answer Document
|
| 01/06/2012 |
01/31/2012 |
DNR-120026 |
Ohio Department of Natural Resources |
Lake Water Quality Improvement Project - Statewide
|
Environmental Engineering |
TBD
|
N/A
|
| 01/06/2012 |
01/26/2012 |
OSU-120206 |
The Ohio State University |
Celeste & Evans Cooling Improvements
|
HVAC Engineering |
$1,500,000
|
N/A
|
| 10/06/2011 |
01/20/2012 |
DAS-11N006 |
Ohio Department of Administrative Services - SAO Office of Energy Services |
Energy Conservation Project - Hocking College (RFP)
|
Energy Performance Contracting |
TBD
|
N/A
|
| 12/15/2011 |
01/12/2012 |
OHU-12092011 |
Ohio University |
Housing Redevelopment
|
Architectural Programming and Design |
$368,000,000
|
N/A
|
| 12/27/2011 |
01/10/2012 |
OSU-110672 |
The Ohio State University |
North Residential District Transformation (Infrastructure Team)
|
Civil Engineering |
TBD
|
N/A
|
| 12/02/2011 |
01/05/2012 |
DNR-120020 |
Ohio Department of Natural Resources |
Coal Permit Engineer Review Services
|
Civil Engineering, Geotechnical Engineering |
$225,000
|
N/A
|
|
|
|
|
|
Below are RFQs past the response deadline date. These documents are for reference only. At the end of each month, all RFQs published that month are compiled into an "Ohio Register" document using the next issue number. The archived Ohio Register issues are accessible by clicking here.
| Published Date |
Due Date |
Project No. |
Agency/
Institution |
Project Name |
Primary Service |
Project Cost (Est.)
|
Q&A
|
| 12/09/2011 |
12/29/2011 |
DRC-110019 |
Ohio Department of Rehabilitation and Correction |
Roof Replacement Warehouse and D Building - ACI.
|
Architectural |
$710,000
|
N/A
|
| 12/09/2011 |
12/28/2011 |
OSU-120210 |
The Ohio State University |
OARDC-Ag Engineering Building Repl.
|
Architectural/Site Planning |
$14,000,000
|
N/A
|
| 12/02/2011 |
12/23/2011 |
DMH-120003 |
Ohio Department of Mental Health |
Patient Unit Renovations - Appalachian Behavioral Healthcare
|
Architectural |
$1,700,000
|
Question & Answer Document
|
| 11/16/2011 |
12/20/2011 |
DNR-120018 |
Ohio Department of Natural Resources |
Landscape Planning and Improvements
|
Landscape Architecture |
TBD
|
N/A
|
| 11/29/2011 |
12/19/2011 |
OHU-11292011 |
Ohio University |
Housing Utility Infrastructure Development
|
Civil Engineering |
$10,500,000
|
N/A
|
| 11/16/2011 |
12/16/2011 |
Varies |
The Ohio State University |
General Qualifications for Prequalification List of Professional Services - F330 Form, Part II
|
Varies |
Varies
|
N/A
|
| 11/25/2011 |
12/12/2011 |
OSU-120217 |
The Ohio State University |
Kottman Hall Fire Alram System
|
Engineer - Fire Alarm |
$512,631
|
N/A
|
| 11/01/2011 |
11/29/2011
11/14/2011 |
OSU-110672 |
The Ohio State University |
North Residential District Transformation (Architect of Record - Phase 1)
|
Architectural |
$100,000,000
|
Question & Answer Document
|
| 11/03/2011 |
11/28/2011 |
MUN-100017 |
Miami University |
Cook Field Renovation
|
Landscape Architect |
$3,500,000
|
Question & Answer Document
|
| 11/01/2011 |
11/09/2011 |
OSU-081049 |
The Ohio State University |
Selected Tunnel Replacement Projects
|
Civil |
$6,380,000
|
N/A
|
| 10/06/2011 |
11/01/2011 |
DOT-120004 |
Ohio Department of Transportation |
Mayfield Maintenance Facility
|
Architectural |
$3,500,000
|
Question & Answer Document
|
| 10/06/2011 |
10/27/2011 |
DOT-120003 |
Ohio Department of Transportation |
Lucas County Maintenance Facility
|
Architectural |
$3,500,000
|
N/A
|
| 09/30/2011 |
10/14/2011 |
BGU-115709 |
Bowling Green State University |
2012 Parking Lot Paving
|
Civil Engineering |
$1,500,000
|
N/A
|
| 09/21/2011 |
10/05/2011 |
DRC-100011 |
Ohio Department of Rehabilitation and Correction |
CCI Flat Roof Renovation
|
Architectural |
$1,401,010
|
N/A
|
| 09/14/2011 |
10/05/2011 |
BGU-115706 |
Bowling Green State University |
Park Avenue Warehouse Renovations
|
Architectural |
$2,900,000
|

Q&A Document
|
| 09/16/2011 |
09/30/2011 |
OSU-120059 |
Ohio State University |
Cannon Drive Relocation - Phase 1
|
Landscape Architect |
$17,500,000
|
N/A
|
| 09/08/2011 |
09/30/2011 |
DMH-110003 |
Ohio Department of Mental Health |
Fire Sprinkler Pipe Inspection, Testing & Analysis
|
Engineering |
$120,000
|
N/A
|
| 09/08/2011 |
09/22/2011 |
DRC-110016 |
Ohio Department of Rehabilitation & Correction |
Water Treatment Plant Upgrade - Ross Correctional Institution
|
Engineering |
$1,320,166
|
N/A
|
| 08/12/2011 |
09/09/2011 |
OSU-100652 |
Ohio State University |
Various Building Demolitions
|
Architect |
$1,353,000
|
N/A
|
| 08/22/2011 |
09/06/2011 |
DAS MARCS Chillicothe Tower |
MARCS |
Chillicothe Tower, Chillicothe, Ross County, OH
|
Pre-construction and post-construction |
See link for details
|
N/A
|
| 08/22/2011 |
09/06/2011 |
DAS MARCS Tar Hollow Tower |
MARCS |
Tar Hollow Tower, Tar Hollow State Park, Ross County, OH
|
Pre-construction and post-construction |
See link for details
|
N/A
|
| 08/22/2011 |
09/06/2011 |
DAS MARCS Keene-Coshocton (White Eyes) Tower |
MARCS |
Keene-Cochocton (White Eyes) Tower, Cochocton County, OH
|
Pre-construction and post-construction |
See link for details
|
N/A
|
| 08/22/2011 |
09/06/2011 |
DAS MARCS Mt. Orab Tower |
MARCS |
Mt. Orab Tower, Mt. Orab, Brown County, OH
|
Pre-construction and post-construction |
See link for details
|
N/A
|
| 08/01/2011 |
08/31/2011
08/29/2011
08/22/2011 |
OSU-110672 |
Ohio State University |
North Residential District Transformation
|
Architect, Urban Designer |
TBD
|
N/A
|
| 08/12/2011 |
08/26/2011 |
OSU-120059 |
Ohio State University |
Cannon Drive Relocation-Phase 1
|
Civil Engineer |
$17,500,000
|
N/A
|
| 07/27/2011 |
08/18/2011 |
DRC-110015 |
Ohio Department of Rehabilitation and Correction |
HVAC Upgrade - FPRC
|
Engineering |
$290,895
|
N/A
|
| 07/19/2011 |
08/05/2011 |
SSC-120030 |
Shawnee State University |
Administration Building Renovation
|
Architecture |
$984,855
|
N/A
|
| 07/14/2011 |
07/25/2011
08/01/2011 |
DAS-120001 |
Ohio Department of Administrative Services |
North High Complex - Phase 5
|
Architecture |
$17,453,580
|
Q&A Document
|
| 07/07/2011 |
07/29/2011 |
OU Prequal |
Ohio University |
Basic Renovation - Prequalification List
|
Various |
TBD
|
N/A
|
| 07/01/2011 |
07/28/2011 |
BWC-110001 |
Bureau of Workers' Compensation |
L-16 Halon Replacement Project
|
Engineer - Fire Suppression |
$268,000
|
Q&A Document
|
| 07/12/2011 |
07/22/2011 |
BGU-115687 |
Bowling Green State University |
Landscape and Civic Structure Master Plan
|
Landscape Architecture |
$85,000 - $100,000
|
N/A
|
| 07/01/2011 |
07/22/2011 |
UTO-120742 |
University of Toledo |
Carlson Library Renovations
|
Architectural |
$1,250,000
|
N/A
|
| 06/27/2011 |
07/22/2011 |
DOT-110001 & DOT-110002 |
Ohio Department of Transportation |
Jefferson & Wayne County Maintenance Facilities
|
Architectural |
$7,000,000
|
Q&A Document
|
| 06/24/2011 |
07/18/2011 |
ADJ-110019 |
Adjutant General's Department |
Camp Perry Building 2146 Renovation Project
|
Mechanical Engineer |
$950,000
|
N/A
|
| 06/24/2011 |
07/18/2011 |
ADJ-110022 |
Adjutant General's Department |
Medina Armory Motor Pool Expansion Project
|
Civil Engineer |
$300,000
|
N/A
|
| 06/30/2011 |
07/15/2011 |
DRC-100017 |
Ohio Department of Rehabilitation and Correction |
Domestic Water & HVAC Upgrade - Toledo Correctional Institution
|
Mechanical Engineering |
$549,002
|
N/A
|
| 06/20/2011 |
07/08/2011 |
UTO-121665 |
University of Toledo |
Replace Air Handler 4
|
Mechanical |
$1,400,000
|
N/A
|
| 06/08/2011 |
06/24/2011 |
UTO-111619 |
University of Toledo |
New Operating Rooms 13 and 14
|
Architectural |
$1,400,000
|
N/A
|
| 05/27/2011 |
06/23/2011 |
OSU-110452 |
The Ohio State University |
Med Center- Air Quality and Control Issues
|
HVAC Engineering |
$1,000,000
|
N/A
|
05/27/2011
(updated 06/16/2011) |
06/21/2011 |
KSU-11B168 |
Kent State University |
LEED Process Consulting Services
|
LEED Consulting Services |
$210,000,000
|
Question & Answer Document
|
| 05/19/2011 |
06/13/2011 |
DNR-110032 |
Ohio Department of Natural Resources |
AML- AMD Drafting/Design Services
|
Drafting/Civil Engineering |
$200,000
|
N/A
|
| 05/04/2011 |
05/31/2011
06/03/2011
|
KSU-11B146, KSU-11B147, KSU11B148 |
Kent State University |
Renovations and Addition to Multiple Science Buildings - Architectural Team
|
Architectural |
$47,300,000
|
Question & Answer Document
|
| 05/04/2011 |
05/31/2011
06/03/2011
|
KSU-11B146,
KSU-11B147, KSU11B148 |
Kent State University |
Renovations and Addition to Multiple Science Buildings - MEP Engineer Team
|
MEP Engineer |
$47,300,000
|
Question & Answer Document
|
| 05/04/2011 |
05/31/2011
06/03/2011
|
Varies |
Kent State University |
Multiple Project - Construction Management Services
|
Construction Manager |
$250,000,000
|
Question & Answer Document
|
| 05/10/2011 |
05/25/2011 |
DRC-100053 |
Ohio Department of Rehabilitation and Correction |
MCI Shower Renovation
|
Architectural |
$505,000
|
N/A
|
| 02/09/2011 |
05/20/2011 |
DRC-030081 |
SAO Energy Services |
Request for Proposal - Energy Conservation Project, Ohio Reformatory for Women
|
Energy Conservation |
TBD
|
Additional Information |
| 05/03/2011 |
05/20/2011 |
BGU-115646 |
Bowling Green State University |
McDonald Hall Phase III Feasibility Study
|
Architectural |
$7,000,000
|
Addendum
|
| 05/03/2011 |
05/20/2011 |
ADJ-110017 |
Adjutant General's Department |
Rickenbacker Enclave Paving Renovation
|
Civil Engineering |
$2,500,000
|
N/A
|
| 04/20/2011 |
05/16/2011 |
ADJ-110013 |
Adjutant General's Department |
Norwalk Armory Plumbing Renovation
|
Plumbing |
$150,000
|
N/A
|
| 04/15/2011 |
05/16/2011 |
OHU-110102 |
Ohio University |
HDL Center Renovation
|
Architectural |
TBD
|
N/A
|
| 04/20/2011 |
05/16/2011 |
ADJ-110009 |
Adjutant General's Department |
Walbridge Armory HVAC Renovation
|
Mechanical |
$540,000
|
N/A
|
| 04/20/2011 |
05/16/2011 |
ADJ-110010 |
Adjutant General's Department |
Greenville Armory Masonry Renovation
|
Architectural |
$180,000
|
N/A
|
| 04/20/2011 |
05/16/2011 |
ADJ-110011 |
Adjutant General's Department |
Youngstown Armory Paving Renovation
|
Mechanical |
$250,000
|
N/A
|
| 04/20/2011 |
05/16/2011 |
ADJ-110012 |
Adjutant General's Department |
Tarlton Armory Plumbing Renovation
|
Plumbing |
$185,000
|
N/A
|
| 03/29/2011 |
05/02/2011 |
OSU-080267 |
Ohio State University |
Boiler Replacement
|
Mechanical Engineering |
$15,180,000
|
N/A
|
| 04/18/2011 |
05/02/2011 |
UCN-09113A |
University of Cincinnati |
AHC Campus Laboratory Energy Savings
|
HVAC |
$3,340,000
|
N/A
|
| 04/12/2011 |
04/29/2011 |
UTO-111624 |
The University of Toledo |
New Cancer Center
|
Architectural |
$5,500,000
|
N/A
|
| 03/29/2011 |
04/29/2011 |
OSU-081255 |
Ohio State University |
High Voltage Switch and Cable Replacement Phase 2
|
Electrical Engineering |
$13,340,000
|
N/A
|
| 03/29/2011 |
04/29/2011 |
ZSC-6-2011-1 |
Zane State College |
Advanced Science & Technology Center (CM)
|
Construction Managemenet |
$9,750,000
|
Program of Requirements
|
| 03/29/2011 |
04/29/2011 |
ZSC-7-2011-1 |
Zane State College |
Cambridge Training & Education Center (CM)
|
Construction Management |
$10,000,000
|
Program of Requirements
|
| 03/29/2011 |
04/26/2011 |
OHU-110101 |
Ohio University |
McCracken Hall Renovation & Expansion
|
Architecture |
$22,100,000
|
N/A
|
| 04/12/2011 |
04/22/2011 |
315-2005-993-9 |
Ohio State University |
Clinical Expansion, Cancer and Critical Care Tower (MCFP) - TAB
|
Testing, Adjusting and Balancing (TAB) |
$701,194,629
|
N/A
|
| 03/04/2011 |
04/20/2011 |
DAS-11S888 |
State Architect's Office |
Scheduling Consultant List
|
Varies by project |
Varies by project
|
Q&A Document
|
| 03/04/2011 |
04/20/2011 |
DAS-11F888 |
State Architect's Office |
Neutral Facilitation Consultant List
|
Varies by project |
Varies by project
|
Q&A Document
|
| 03/04/2011 |
04/20/2011 |
DAS-11D888 |
State Architect's Office |
Claims Analysis / Dispute Resolution Consultant List
|
Varies by project |
Varies by project
|
Q&A Document
|
| 03/18/2011 |
04/18/2011 |
DNR-110024 |
Ohio Department of Natural Resources |
Abandoned Mine Lands - Emergency Program Engineering Services - Various Locations in Eastern Ohio
|
Civil/Geotechnical Engineering; Mining Engineering |
TBD
|
N/A
|
| 03/29/2011 |
04/15/2011 |
OSU-110101 |
Ohio State University |
Caldwell - Lab Expansion
|
Architect |
$632,904
|
N/A
|
| 03/29/2011 |
04/07/2011 |
OSU-110451 |
Ohio State University |
Dodd Hall - AHU Replacement
|
HVAC Engineering |
$1,500,000
|
N/A
|
| 03/02/2011 |
04/05/2011 |
DNR-110020 |
Ohio Department of Natural Resources |
Ohio Risk Mapping, Assessment & Planning (Risk MAP) - Various Counties within Ohio
|
Civil/Agricultural Engineering; Hydraulic and Hydrology |
TBD
|
N/A
|
| 03/02/2011 |
04/05/2011 |
DNR-100001 |
Ohio Department of Natural Resources |
Horace R. Collins Laboratory Renovation - Alum Creek State Park
|
Architectural; Civil Engineering |
$297,000
|
N/A
|
| 03/02/2011 |
04/05/2011 |
DNR-100038 |
Ohio Department of Natural Resources |
Lodge Electric Upgrades - Punderson State Park
|
Electrical Engineering; Mechanical Engineering |
$650,000
|
N/A
|
| 03/29/2011 |
04/04/2011 |
KSU-11L123 |
Kent State University |
Tri-Towers Residence Halls Rooms and HVAC Upgrades (Architect)
|
Architecture |
$30,000,000
|
Q&A Document
|
| 03/29/2011 |
04/04/2011 |
KSU-11L123 |
Kent State University |
Tri-Towers Residence Halls Rooms and HVAC Upgrades (MEP)
|
Mechanical, Electrical, Plumbing Engineer |
$30,000,000
|
Q&A Document
|
| 03/02/2011 |
04/04/2011 |
BGU-115603 |
Bowling Green State University |
Architectural Services Consultant List
|
Architecture |
Varies with project
|
N/A
|
| 03/18/2011 |
03/31/2011 |
OHU Feasibility Study |
Ohio University |
Power Plant Feasibility Study
|
Mechanical Engineering |
$100,000
|
N/A
|
| 03/07/2011 |
03/31/2011 |
ZSC-6-2011-1 |
Zane State College |
Advanced Science & Technology Center (A/E)
|
Architectural and Engineering |
$9,750,000
|
Program of Requirements
|
| 03/07/2011 |
03/31/2011 |
ZSC-7-2011-1 |
Zane State College |
Cambridge Training & Education Center (A/E)
|
Architectural and Engineering |
$10,000,000
|
Program of Requirements
|
| 03/09/2011 |
03/25/2011 |
UTO-111387 |
University of Toledo |
Resource & Community Learning Center - Phase II
|
Architecture |
$900,000
|
N/A
|
| 03/10/2011 |
03/25/2011 |
UTO-111605 |
University of Toledo |
Hospital Clinical Laboratory
|
Architecture |
$200,000
|
N/A
|
| 03/09/2011 |
03/25/2011 |
UTO-110129 |
University of Toledo |
Core Research Facility - Phase IV
|
Architecture |
$929,586
|
N/A
|
| 03/07/2011 |
03/15/2011 |
OSU-110269 |
The Ohio State University |
Northwest Parking Garage Renovation
|
Structural Engineer |
$1,076,705
|
N/A
|
| 02/10/2011 |
03/10/2011 |
DAS-11C888 |
State Architect's Office |
Constructability Review Consultant List
|
Varies |
Varies
|
Q&A Document
|
| 02/09/2011 |
03/10/2011 |
CTI-110001 |
Columbus State Community College |
Columbus State Master Plan
|
Master Planning |
To be negotiated
|
Q&A Document
|
| 02/24/2011 |
03/09/2011 |
UCN-09137A |
University of Cincinnati |
Storm Water Demonstration Project at the University of Cincinnati's Uptown Campus West
|
Civil Engineer and Landscape Architect |
$2,600,000
|
N/A
|
| 02/22/2011 |
03/09/2011 |
OSU-030976 |
The Ohio State University |
Community Heritage Art Gallery
|
Architect |
$238,894
|
N/A
|
| 02/14/2011 |
02/28/2011 |
UCN-10016B |
University of Cincinnati |
Primary Electric Substation
|
Electrical |
$7,300,000
|
N/A
|
| 01/20/2011 |
02/26/2011 |
DNR-100011 |
Ohio Department of Natural Resources |
A-Frame Bridge/Trail System Improvements
|
Civil Engineering |
$800,000
|
N/A
|
| 02/09/2011 |
02/25/2011 |
UCN-11096A |
University of Cincinnati |
Crosley Tower - Air Handling Unit Replacement
|
Mechanical and Electrical Engineering |
$1,500,000
|
N/A
|
| 01/18/2011 |
02/17/2011 |
DAS-11N777 |
State Architect's Office |
Energy and Commissioning Consultant List
|
Various |
Varies
|
Q&A Document
|
| 01/20/2011 |
02/16/2011 |
OHU-Lausche |
Ohio University |
Lausche Heating Plant - Solar Array Addition
|
Electrical Engineering |
$581,000
|
N/A
|
| 12/17/2010 |
01/26/2011 |
UCN-09080A |
University of Cincinnati |
CARE Roof Fan Support Modifications
|
Structural Engineering |
$450,000
|
N/A
|
| 01/11/2011 |
01/21/2011 |
5062-PF07357 |
The Ohio State University |
East Regional Chilled Water Plant (CA)
|
Chilled Water Plant Facility Commissioning Services |
$41,055,000
|
N/A
|
| 12/20/2010 |
01/21/2011 |
YSU-111224 |
Youngstown State University |
STEM Planning
|
Planning |
$200,000
|
N/A
|
| 01/04/2011 |
01/20/2011 |
BGU-015585 |
Bowling Green State University |
PSLB HVAC Upgrades & Fume Hood Replacement
|
Mechanical-HVAC Controls |
$3,000,000
|
N/A
|
| 12/15/2010 |
01/12/2011 |
UCN-04132B |
University of Cincinnati |
MSB Rehabilitation - Phase 4
|
Construction Management |
$82,944,661
|
N/A
|
| 12/17/2010 |
01/06/2011 |
OSU-110215 |
The Ohio State University |
Street and Bridge Maintenance Phase 1
|
Civil Engineering |
$2,800,000
|
N/A
|
| 12/07/2010 |
01/04/2011 |
MUN-100017 |
Miami University |
Campus Circulation & Transportation Master Plan
|
Planning (non-motorized travel) |
TBD
|
N/A
|
| 11/17/2010 |
01/04/2011 |
RGC-100001 |
Rio Grande Community College |
RGCC Campus Master Plan
|
Campus Master Planning |
$70,000
|
N/A
|
|
|
|
|
|
Below are RFQs past the response deadline date. These documents are for reference only. At the end of each month, all RFQs published that month are compiled into an "Ohio Register" document using the next issue number. The archived Ohio Register issues are accessible by clicking here.
| Published Date |
Due Date |
Project No. |
Agency/
Institution |
Project Name |
Primary Service |
Project
Cost (Est.)
|
Q&A / Misc.
|
| 12/08/2010 |
12/23/2010 |
OSU-091418 |
The Ohio State University |
Sullivant Hall and Billy Ireland Cartoon Library & Museum
|
Commissioning Agent |
$24,361,962
|
N/A
|
| 11/24/2010 |
12/22/2010 |
WSU-110028 |
Wright State University |
Raider Road Extension
|
Civil Engineering |
$1,010,000
|
N/A
|
| 11/29/2010 |
12/20/2010 |
5062-PF07357 |
The Ohio State University |
East Regional Chilled Water Plant - Civil Engineer
|
Civil Engineering |
$43,000,000
|
N/A
|
| 11/10/2010 |
12/15/2010 |
DAS-11E999 |
State Architect's Office |
Engineer and Surveyor Consultant List
|
Various |
Various
|
Q&A Document
|
| 11/24/2010 |
12/13/2010 |
UCN-11019A & UCN-10071A |
University of Cincinnati - Raymond Walters College |
Annex and Muntz Hall Renovations
|
Architecture, Programming |
$4,500,000
|
Q&A Document
|
| 11/24/2010 |
12/10/2010 |
OSU Prequal |
The Ohio State University |
General Qualifications for Prequalification List of Professional Services-F 330 Form, Part II
|
Varies |
Varies
|
N/A
|
| 11/22/2010 |
12/06/2010 |
OHU Infrastructure |
Ohio University |
2010 Building Infrastructure Improvements
|
Mechanical/Electrical/Plumbing (MEP) |
$2,200,000
|
N/A
|
| 11/10/2010 |
12/03/2010 |
OSU-110099 |
The Ohio State University |
Graves Hall Chiller Replacement
|
Mechanical Engineering |
$1,698,470
|
N/A
|
| 10/27/2010 |
12/01/2010 |
DAS-11A999 |
State Architect's Office |
Architect and Landscape Architect Consultant List
|
Various |
Various
|
Q&A Document |
| 11/10/2010 |
11/30/2010 |
OSU-110207 |
The Ohio State University |
Howlett Hall Roof Replacement
|
Architectural |
$832,821
|
N/A
|
| 10/29/2010 |
11/19/2010 |
OHU-111690 |
Ohio University |
Jefferson Hall Roof Rehabilitation
|
Architectural/Engineering |
$2,850,000
|
N/A
|
| 10/19/2010 |
11/18/2010 |
DNR-110009 |
Ohio Dept. of Natural Resources |
Statewide Dam Safety Design Services - Phase 2
|
Civil Engineering, Geotechnical Engineering |
TBD
|
N/A
|
| 11/04/2010 |
11/12/2010 |
315-2005-993-9 |
The Ohio State University |
Clinical Expansion, Cancer and Critical Care Tower (MCFP), Building Envelope
|
Exterior Building Envelope Consultant |
$601,216,428
|
N/A
|
| 11/02/2010 |
11/10/2010 |
OSU-110195 |
The Ohio State University |
Outdoor Sports Complex Renovation
|
Architectural |
$4,379,432
|
N/A
|
| 10/21/2010 |
11/09/2010 |
CLS-101007 |
Cleveland State University |
MC - Roof Replacement
|
Architectural |
$4,400,000
|
N/A
|
| 10/29/2010 |
11/05/2010 |
OSU-100398 |
The Ohio State University |
McCampbell Hall - Ambulatory Modifications
|
Commissioning MEP Systems |
$10,500,000
|
N/A
|
| 10/05/2010 |
11/01/2010 |
OHU-111680 |
Ohio University |
West Green Landscape and Utility 2011
|
Landscape Architect |
$1,114,000
|
N/A
|
| 10/19/2010 |
10/29/2010 |
OSU-110191 |
The Ohio State University |
South Cannon Garage Renovations (MCFP)
|
Architectural |
$4,447,436
|
N/A
|
| 10/05/2010 |
10/22/2010 |
UTO-111538 |
The University of Toledo |
Clinical Simulation Center, Phase 1 and 2
|
Architectural |
$1,000,000 (Phase 1)
|
Q&A Document |
| 09/21/2010 |
10/21/2010 |
DNR-110003 |
Ohio Department of Natural Resources |
Caeser Creek Marina, Warren County
|
Civil Engineering |
$7,000,000
|
N/A
|
| 09/29/2010 |
10/18/2010 |
UCN-10093A |
University of Cincinnati |
Siddall MarketPointe Renovation
|
Architectural |
$2,300,000
|
N/A
|
| 09/28/2010 |
10/15/2010 |
OHU-111670 |
Ohio University |
Athena Renovation
|
Architectural |
$1,000,000
|
N/A
|
| 10/05/2010 |
10/15/2010 |
OSU-110100 |
The Ohio State University |
Roof Repair and Replacement Phase 1 (Plumb, Weigel, Wiseman Halls, Vet Med Center)
|
Architectural |
$1,713,715
|
N/A
|
| 10/05/2010 |
10/15/2010 |
OSU-110102 |
The Ohio State University |
Roof Repair and Replacement Phase 2 (Journalism Building and Mount Hall)
|
Architectural |
$1,713,715
|
N/A
|
| 09/27/2010 |
10/13/2010 |
OSU-108001 |
The Ohio State University |
BRT Site Electrical Improvements, Biomedical Research Tower
|
MEP Engineering (Electrical Lead) |
$2,700,000
|
N/A
|
| 10/01/2010 |
10/08/2010 |
315-2005-993-9 |
The Ohio State University |
Clinical Expansion, Cancer and Critical Care Tower (MCFP), Testing and Inspections
|
Material Testing / Inspection and Engineering |
$601,216,428
|
N/A
|
| 09/30/2010 |
10/08/2010 |
UTO-10656R |
The University of Toledo
(Includes Attachments) |
Bowman-Oddy Laboratories / Wolfe Hall Renovation (Center for Biosphere Restoration Research)
|
Construction Management |
$7,888,000
|
Q&A Document |
| 09/27/2010 |
10/08/2010 |
SSC-100022 |
Shawnee State University |
Fine Arts Center Boiler Replacement Project
|
MEP Engineering |
$285,000
|
N/A
|
| 09/27/2010 |
10/08/2010 |
OSU-080268 |
The Ohio State University |
Central Power Plant Water Treatment, McCracken Power Plant
|
Project Management |
$14,289,000
|
N/A
|
| 09/21/2010 |
10/08/2010 |
YSU-111202 |
Youngstown State University |
Fifth Avenue Athletic Fields
|
Landscape Architecture |
$2,100,000
|
N/A
|
| 09/09/2010 |
10/01/2010 |
UTO-111564 |
The University of Toledo |
UMC 3rd Floor Renovations, Toledo, OH
|
Engineering / Architectural |
$4,100,000
|
N/A
|
| 09/21/2010 |
09/30/2010 |
OSU-100398 |
The Ohio State University |
McCampbell Hall - Ambulatory Modifications
|
Architect |
$10,500,000
|
N/A
|
| 09/09/2010 |
09/27/2010 |
MUN-100016 |
Miami University Oxford Campus |
Maplestreet Station and Western Campus Site Infrastructure, Oxford, OH
|
Mechanical, Civil |
$5,000,000 Maplestreet Station; $9,000,000 Western Campus
|
N/A
|
| 09/09/2010 |
09/24/2010 |
UTO-110687 |
The University of Toledo |
Campus Electrical Upgrades, Toledo, OH
|
Electrical |
$1,900,000
|
N/A
|
| 09/08/2010 |
09/23/2010 |
OSU-100758 |
The Ohio State University |
OARDC Thorne House Renovation, Wooster, OH
|
Architectural |
$225,000
|
N/A
|
08/30/2010
(updated 08/31/2010) |
09/17/2010 |
YSU-111204 |
Youngstown State University |
M1 & M2 Parking Deck Repair/Restoration, Youngstown, OH
|
Structural |
$5,200,000
|
N/A
|
| 08/24/2010 |
09/15/2010 |
OSU-100504 |
The Ohio State University |
Morehouse Pavilion / Concourse / Tower - ADA Renovation, Columbus, OH
|
Architectural |
$520,000
|
N/A
|
| 09/01/2010 |
09/15/2010 |
OHU-101660 |
Ohio University |
Bromley Hall Renovation, Athens, OH
|
Architectural |
$9,300,000
|
N/A
|
| 08/18/2010 |
09/08/2010 |
OSU-090527 |
The Ohio State University |
Morrill Hall Office
Renovation, Marion, OH
|
Architectural |
$122,768
|
N/A
|
| 08/18/2010 |
09/08/2010 |
OSU-090485 |
The Ohio State University |
OARDC-Physical Plant Building Renovation, Wooster, OH |
Architectural |
$450,000
|
N/A
|
| 08/13/2010 |
08/27/2010 |
SSC-110001 |
Southern State Community College |
District-Wide Facilities Assessment, Various Locations |
Facilities Assessment |
$75,000- $100,000
|
N/A
|
| 08/09/2010 |
08/31/2010 |
WSU-090025 |
Wright State University |
Concert Hall Renovation, Creative Arts Building, Dayton, OH |
Architectural |
$4,228,000
|
N/A
|
08/05/2010
(updated 08/09/2010) |
08/31/2010 |
WSU-110006 |
Wright State University |
Rinzler Athletic Complex, Fairborn, OH |
Architectural |
$4,400,000
|
N/A
|
07/30/2010
(updated 08/02/2010) |
08/20/2010 |
WSU-110002 |
Wright State University |
Main Campus Water Main Rehabilitation, Dayton, OH |
Mechanical Engineering (Plumbing) |
$2,400,000
|
N/A
|
| 07/23/2010 |
08/05/2010 |
MUN-100015 |
Miami University |
Mosler Hall Ceiling Renovation, Hamilton Campus, Hamilton, OH |
Mechanical, Electric, Fire Protection |
$870,000
|
N/A
|
| 06/22/2010 |
07/23/2010 |
DNR-090006 |
Ohio Department of Natural Resources |
Lake Alma State Park Campground Improvements, Lake Alma State Park, Vinton County, OH |
Civil Engineering |
$750,000
|
N/A
|
| 06/22/2010 |
07/23/2010 |
DNR-090006 |
Ohio Department of Natural Resources |
Lake Alma State Park Campground Improvements, Lake Alma State Park, Vinton County, OH |
Civil Engineering |
$750,000
|
N/A
|
| 06/22/2010 |
07/23/2010 |
DNR-100045 & DNR-100046 |
Ohio Department of Natural Resources |
Statewide Water and Wastewater System Upgrades - Phase III |
Civil Engineering |
$6,000,000
|
N/A
|
| 06/30/2010 |
07/21/2010 |
DRC-090051 |
Ohio Dept. of Rehabilitation & Corrections |
Roof Replacement 2010 - Lebanon Correctional, Lebanon Correctional Institution, Lebanon, OH |
Architecture |
$4,516,562
|

|
| 07/01/2010 |
07/16/2010 |
OSU-081060 |
The Ohio State University |
Steam & Condensate Distribution System Upgrades Phase 2, Columbus, OH |
Mechanical (Steam Systems) |
$17,100,000
|
N/A
|
| 07/01/2010 |
07/16/2010 |
OSU-090468 |
The Ohio State University |
Howlett - Kottman Steam Upgrades, Columbus, OH |
Mechanical (Steam Systems) |
$1,982,907
|
N/A
|
| 07/01/2010 |
07/16/2010 |
OSU-100738 |
The Ohio State University |
Pomerene - History of Art Renovation, Columbus, OH |
Architectural |
$400,000
|
N/A
|
| 06/18/2010 |
07/02/2010 |
UTO-100656 |
The University of Toledo |
Center for Biosphere Restoration Research: Bowman-Oddy Laboratories and Wolfe Hall Renovations, Toledo, OH |
Construction Manager at Risk (Construction Reform Demonstration Project) |
$7,888,000
|

|
| 06/08/2010 |
06/25/2010 |
UTO-110665 |
The University of Toledo |
Renovation / Addition to Center for Performing Arts, Toledo, OH |
Architecture |
$2,000,000
|

|
| 06/04/2010 |
06/25/2010 |
OSU-100704 |
The Ohio State University |
Kottman Hall Roof Replacement, Columbus, OH |
Architecture |
$985,000
|
N/A
|
06/02/2010
|
07/01/2010 |
UCN-10014A
(revised 06/04/10) |
The University of Cincinnati |
Sander Classroom Renovation, Cincinnati, OH |
Architecture |
$6,000,000
|
N/A
|
| 06/02/2010 |
06/23/2010 |
OHU-101650 |
Ohio University |
Nelson Commons Renovation, Athens, OH |
Architectural / Interiors |
$9,100,000
|
N/A
|
| 05/28/2010 |
06/28/2010 |
OSU-091327 |
The Ohio State University |
Emergency Generators Plan Development, Columbus, OH |
Power Electrical Engineering |
$450,000
|
N/A
|
| 05/28/2010 |
06/23/2010 |
OSU-081047 |
The Ohio State University |
John Herrick Drive Rebuild Phase 1, Columbus, OH |
Civil Engineering |
$6,300,000
|
N/A
|
| 05/28/2010 |
06/15/2010 |
MUN-100014
(revised 06/01/10) |
Miami University |
Harris Dining Hall HVAC Replacement, Oxford, OH |
Mechanical, Electrical & Plumbing |
$1,400,000
|
N/A
|
| 05/27/2010 |
06/14/2010 |
DMR-100003 |
Ohio Dept. of Developmental Disabilities |
NODC Paving 2010, Northwest Ohio Developmental Center, Toledo, OH |
Civil Engineering |
$400,000
|
N/A
|
| 05/21/2010 |
06/11/2010 |
DRC-090053
(revised 5/25/10) |
Ohio Dept. of Rehabilitation & Correction |
HVAC Upgrade 2010, Warren Correctional Institution, Lebanon, OH |
Mechanical Engineering |
$2,500,000
|

|
| 05/21/2010 |
06/11/2010 |
DRC-090040 |
Ohio Dept. of Rehabilitation & Correction |
Ohio State Penitentiary, 2010 Roof Replacement, Youngstown, OH |
Architectural/Engineering |
$1,685,000
|
N/A
|
| 05/12/2010 |
06/02/2010 |
OSU-315-07-1571 |
The Ohio State University |
OARDC - Selby Hall Phytotron Facility Renovation, Wooster, OH |
Architectural |
$2,000,000
|
N/A
|
| 05/12/2010 |
06/02/2010 |
UCN-10000A |
The University of Cincinnati - Uptown West Campus |
Rieveschl Hall 600 and &00 Lvl Renovation, Cincinnati, OH |
Architectural |
$13,000,000
|
N/A
|
| 04/02/2010 |
05/06/2010 |
DNR-100035 |
Ohio Dept. of Natural Resources |
Pike Lake, Pond Lick Lake and Roosevelt Lake Dam and Spillway Rehabilitations |
Civil Engineering, Geotechnical Engineering |
$6,000,000
|
N/A
|
| 02/05/2010 |
05/03/2010 |
DNR Prequal |
Ohio Dept. of Natural Resources |
ODNR Pre-qualification for FY 2011-2012 |
Varies |
Varies
|
N/A
|
| 04/02/2010 |
04/16/2010 |
CSU-100010 |
Central State University |
Emery Hall Preservation & Restoration - Phase IV |
Construction Manager at Risk (Construction Reform Demonstration Project) |
$1,780,000
|

|
| 03/23/2010 |
04/16/2010 |
OHU-101640 |
Ohio University |
Bush Hall Renovation |
Architectural |
$11,300,000
|
N/A
|
| 03/23/2010 |
04/22/2010 (revised from 04/16/2010) |
5062-PF07357 |
The Ohio State University |
East Regional Chilled Water Plant |
Construction Management |
$41,055,000
|
N/A
|
| 03/19/2010 |
04/13/2010 |
DRC-100036 |
Ohio Dept. of Rehabilitation & Correction |
Roof Renovation - Montgomery Education and Pre-Release Center |
Architectural |
$510,000
|
N/A
|
| 03/15/2010 |
04/06/2010 |
DRC-100037 |
Ohio Dept. of Rehabilitation & Correction |
Housing Unit Window Replacement - Grafton Correctional Institution |
Architectural |
$832,216
|
N/A
|
| 03/12/2010 |
04/02/2010 |
OSU-090442 |
The Ohio State University |
Smith Lab Renovation |
HVAC, Electrical, Controls System and Piping Engineering |
$12,100,000
|
N/A
|
| 03/12/2010 |
04/02/2010 |
OSU-090442 (CX) |
The Ohio State University |
Smith Lab Renovation (CX) |
Mechanical, Electrical, Plumbing Commissioning Service |
$12,100,000
|
N/A
|
| 02/24/2010 |
04/01/2010 |
DNR-100029 |
Ohio Dept. of Natural Resources |
Dam and Spillway Rehabilitations |
Civil Engineering, Geotechnical Engineering |
$12,000,000
|
N/A
|
| 03/11/2010 |
03/31/2010 |
5062-PF07357 |
The Ohio State University |
East Regional Chilled Water Plant - MEP Engineer |
MEP Engineering |
$41,055,000
|
N/A
|
| 03/04/2010 |
03/24/2010 |
5062-PF07357 |
The Ohio State University |
East Regional Chilled Water Plant - Architect of Record |
Architectural |
$41,055,000
|
N/A
|
| 03/04/2010 |
03/19/2010 |
OSU-109000 |
The Ohio State University |
South High Rises Renovations and Additions - Commissioning Authority |
Commissioning Services |
$171,600,000
|
N/A
|
| 02/24/2010 |
03/17/2010 |
5062-PF07357 |
The Ohio State University |
East Regional Chilled Water Plant - Design Architect |
Architectural Design |
$41,055,000
|
N/A
|
| 02/24/2010 |
03/15/2010 |
OSU-100266 |
The Ohio State University |
Stone Laboratory Green Energy Program - Phase I |
MEP Engineering |
$320,000
|
N/A
|
| 02/10/2010 |
03/12/2010 |
DNR-100026 |
Ohio Dept. of Natural Resources |
Lonz Winery Property Development Study |
Property Development & Strategic Planning / Investment Planning |
TBD
|
N/A
|
| 02/05/2010 |
03/12/2010 |
DNR-100025 |
Ohio Dept. of Natural Resources |
Professional Surveying Services |
Professional Land Surveying |
TBD
|
N/A
|
| 02/22/2010 |
03/10/2010 |
DRC-100025 |
Ohio Dept. of Rehabilitation & Correction |
Sallyport Upgrade - Hocking Correctional Facility |
Architectural |
$447,500
|
N/A
|
| 02/22/2010 |
03/10/2010 |
DRC-100027 |
Ohio Dept. of Rehabilitation & Correction |
R-Block and Gymnasium Roof Replacement - Marion Correctional Institution |
Architectural |
$385,000
|
N/A
|
| 02/16/2010 |
03/10/2010 |
MUN-100013 |
Miami University - Middletown Campus |
MC - Finkelman Auditorium Renovation |
Architectural |
$2,512,562
|
N/A
|
| 02/19/2010 |
03/05/2010 |
OSU-080338 |
The Ohio State University |
College of Medicine Renovation/Addition - Hazardous Material Abatement |
Environmental Consulting |
$13,000,000
|
N/A
|
| 02/19/2010 |
03/04/2010 |
DRC-100012 |
Ohio Dept. of Rehabilitation & Correction |
Sally-port Improvements/Camera Upgrade - Chillicothe Correctional Institution |
Architectural |
$379,000
|
N/A
|
| 02/19/2010 |
03/04/2010 |
DRC-100024 |
Ohio Dept. of Rehabilitation & Correction |
Shower Renovations - Lorain Correctional Institution |
Architectural |
$745,600
|
N/A
|
| 02/08/2010 |
02/26/2010 |
DRC-090061 |
Ohio Dept. of Rehabilitation & Correction |
Fire Suppression System Upgrade / Franklin Pre-Release Center |
Architectural |
$947,500
|
N/A
|
| 02/05/2010 |
02/25/2010 |
MUN-100012 |
Miami University |
Hughes Hall "A" Laboratory Renovation |
Architecture & Instructional Lab Planning |
$2,500,000
|
N/A
|
| 01/27/2010 |
02/24/2010 |
OSU Prequalification |
The Ohio State University |
General Qualifications for Prequalification List of Professional Services - F 330 Form, Part II |
Varies |
Varies
|
N/A
|
| 01/28/2010 |
02/22/2010 |
DRC-100026 |
Ohio Dept. of Rehabilitation & Correction |
Fire Riser Replacement |
Engineering |
$879,687
|
N/A
|
| 01/28/2010 |
02/22/2010 |
DRC-100022 |
Ohio Dept. of Rehabilitation & Correction |
Transformer Renovations |
Engineering |
$463,250
|
N/A
|
| 02/03/2010 |
02/18/2010 |
OSU-090527 |
The Ohio State University |
Morrill Hall Office Renovation |
Architectural |
$122,768
|
N/A
|
| 01/08/2010 |
02/12/2010 |
DRC-090045 |
Ohio Dept. of Rehabilitation & Correction |
HVAC System Upgrade |
Mechanical Engineer |
$1,310,801
|
N/A
|
| 01/08/2010 |
02/10/2010 |
DNR-100020 |
Statewide Lodge Sustainability Study |
Ohio Dept. of Natural Resources |
Property Development & Strategic Planning, Investment Planning |
$150,000
|
N/A
|
| 11/09/2009 |
01/27/2010 |
DAS-100999 |
Ohio Dept. of Administrative Services |
Architect/Engineer Consultant List SUPPLEMENT (See Question/Answer Document) |
Varies with specific project assignment (Architectural, Landscape Architectural, Engineering, and Surveying) |
Varies
|

(revised
01/26/2010)
|
| 12/23/2009 |
01/22/2010
(Revised from
01/15/2010) |
UTO-010656 |
The University of Toledo |
New Science Building (See revised Question/Answer Document) |
Architect |
$30,000,000
|

|
(Project has been
cancelled
as of 01/11/2010) |
01/20/2010 |
OHU-091630 |
Ohio University |
Clippinger Laboratory Addition; Atomistic Construction Facility |
Architecture |
$17,000,000
|
N/A
|
| 12/28/2009 |
01/19/2010 |
DMH-100007 |
Ohio Dept. of Mental Health |
Campus Security Improvements - Northcoast Behavioral Healthcare |
Architecture |
$300,000
|
N/A
|
12/07/2009
(Revised
12/11/2009) |
01/15/2010 |
DRC-090047 |
Ohio Dept. of Rehabilitation & Correction |
Domestic Water & Boiler Replacement - Allen Correctional Institution |
Architectal/Engineering |
$1,425,003
|
N/A
|
| 12/07/2009 |
01/15/2010 |
DRC-090048 |
Ohio Dept. of Rehabilitation & Correction |
Replace Air Handlers/Controls - Lebanon Correctional Institution |
Mechanical Engineering |
$876,750
|
N/A
|
| 12/07/2009 |
01/15/2010 |
DRC-090049 |
Ohio Dept. of Rehabilitation & Correction |
Exterior Door Replacement - Warren Correctional Institution |
Architectural |
$1,360,000
|
N/A
|
| 12/23/2009 |
01/08/2010 |
315-2005-993-9 |
The Ohio State University |
Project One - Survey Support Services |
Surveying |
$467,545,739
|
N/A
|
| 12/23/2009 |
01/06/2010 |
OSU-090445 |
The Ohio State University |
Dreese Exterior Sealant Repair |
Architect |
$1,270,000
|
N/A
|
|
|
|
|
|